Price in Rupiah (Rp)
( 1US$=Rp. 8800 )

Roof Tile Installation
Service Cost
Type: Curved Tile (U1)

Timber Batten
Rp
5,750
/m²
Rp
5,200
/m²
Standard Roof Tile (including Rigt and Left Accessories)
Rp
6,600
/m²
Rp
5,950
/m²
Timber Rafter
Rp
5,500
/m²
Rp
4,950
/m²
Ridge Cap (including free-of-charge waterproofing)
Rp
14,000
/m²
Rp
12,600
/m²
Timber Board and Zinc Gutter
Rp
11,500
/m²
Rp
10,350
/m²
Rooftile Cutting
Rp
6,100
/m²
Rp
5,500
/m²
Ridge Cap Painting (including free-of-charge paint material)
Rp
6,500
/m²
Rp
5,850
/m²
Bird Stop (Flower Stop), special for Romana Roof Tile
Rp
4,900
/m²
Rp
4,400
/m²

Roof Tile Installation
Service Cost
Type: Portuguese (P1), Romana (R1), Slat Flat Tile (SFT), and Indonesiana (I)

Timber Batten
Rp
5,250
/m²
Rp
4,750
/m²
Standard Roof Tile (including Rigt and Left Accessories)
Rp
6,100
/m²
Rp
5,500
/m²
Timber Rafter
Rp
5,500
/m²
Rp
4,950
/m²
Ridge Cap (including free-of-charge waterproofing)
Rp
14,000
/m²
Rp
12,600
/m²
Timber Board and Zinc Gutter
Rp
11,500
/m²
Rp
10,350
/m²
Rooftile Cutting
Rp
5,500
/m²
Rp
4,950
/m²
Ridge Cap Painting (including free-of-charge paint material)
Rp
6,500
/m²
Rp
5,850
/m²
Bird Stop (Flower Stop), special for Romana Roof Tile
Rp
4,900
/m²
Rp
4,400
/m²


Note:

  1. Product Installation Services for Roof Tile and its accessories EXCLUDE other materials,
    such as cement, sand, stone, wood, nail, etc but INCLUDE ridgemortar paint material and
    waterproofing. These services only include installation cost and work tools arrangement.
  2. Price above EXCLUDE 10% VAT (Variance After Tax or Government Tax).
  3. Price list above is valid from APRIL, 01 2001 and subject to change. Please check with our
    sales for current prices.
  4. Price mention above is valid for the installation within Jabotabek (Indonesia - Jakarta,
    Bogor, Tangerang, Bekasi) region and for maximum 8 m roof height above the ground.
    There will be additional charge for building which have more than 8 m height of roof.
  5. 1 (one) year warranty after the job completion.

Conversion Factor:

1 meter (m) = 3.28 feet 1 square meter (m2) = 1.20 yd2
= 1.09 yards
1 foot (ft) = 0.30 meter 1 square foot (ft2) = 0.09 m2
1 yard (yd) = 0.91 meter
_______________________________________________________

DECORATIVE STONE AND HOMOGENOUS BRICK
INSTALLATION SERVICES COST

TYPE OF
JOB COMPLICATION
DECORATIVE STONE
HOMOGENEOUS BRICK
Rp/m2
SIMPLE
Installation without grout
1. Textured Palimanan
2. Richfield
3. Granada
4. New Italian
   
MEDIUM
Installation with grout or
random size stone that
need much cutting process
1. New Alessandrian
2. New Catanian
3. Cameo Peach
4. Caribbean Green
5. Desert Oak
6. Sandstone Colonial
7. Silverish Osaka
8. Tropical Resort
9. Salisbury
SPECIAL
Installation with grout and
random size stone and
much cutting process
1. Castleton
2. Golden Sandstone
3. Britania
4. Mosaic Pattern
5. Monterey

 

Note:

  1. Special for quantity < 20 m2
    » The stone/brick price per m2 is still follow its product price list.
    » Installation product cost for decorative stone and homogenous brick above must be ADDED
    by a minimum charge of Rp. 250,000,- (two-hundreds and fifty-thousand rupiahs), this is
    used for the cost of transportation, generator set availability, cutting machine, etc.
  2. Installation cost is including cement, sand, and mildewproof coating, MATTE CLEAR for
    Decorative Stone and SEALER for Homogenous Brick, its price per litre is Rp. 60,000,-
    (sixty-thousands rupiahs) and can be bought separately.
    » For mixing and thining above use petrol and thinner, with ratio 1:2
    » 1 (one) litre of waterproof coating with 2 litres of thinner can be used for ± 10 m2
    (2 x coating)
  3. Price above is valid for maximum of 2,5 m height above the ground. Height over than 2,5 m
    (with tower) must be added by 20% installation additional charge as general standard.

Conversion Factor:

1 meter (m) = 3.28 feet 1 square meter (m2) = 1.20 yd2
= 1.09 yards
1 foot (ft) = 0.30 meter 1 square foot (ft2) = 0.09 m2
1 yard (yd) = 0.91 meter

end // back to top

 

Tuesday | 06.1.2009
Last Updated 09.02.2003